{"id":47700,"date":"2025-02-26T11:23:18","date_gmt":"2025-02-26T11:23:18","guid":{"rendered":"https:\/\/le12.ma\/fr\/?p=47700"},"modified":"2025-02-26T10:25:45","modified_gmt":"2025-02-26T10:25:45","slug":"apres-le-terminal-a-conteneurs-est-marsa-maroc-operera-le-terminal-ouest-de-nador-west-med","status":"publish","type":"post","link":"https:\/\/le12.ma\/fr\/apres-le-terminal-a-conteneurs-est-marsa-maroc-operera-le-terminal-ouest-de-nador-west-med\/","title":{"rendered":"Apr\u00e8s le Terminal \u00e0 Conteneurs Est, Marsa Maroc op\u00e9rera le Terminal Ouest de Nador West Med"},"content":{"rendered":"<h2><strong>Marsa Maroc et la soci\u00e9t\u00e9 Nador West Med ont sign\u00e9 la <a href=\"https:\/\/le12.ma\/fr\/le-bcij-devoile-les-dessous-du-plan-terroriste-liee-a-daech-visant-le-royaume\/\">convention<\/a> de concession relative au Terminal Ouest de Nador West Med (NWM).<\/strong><\/h2>\n<p><strong>Le Conseil d\u2019Administration de Marsa Maroc a autoris\u00e9 la signature des documents de concession du Terminal Ouest du port Nador West Med portant sur une dur\u00e9e de 25 ans, indique un communiqu\u00e9 de la soci\u00e9t\u00e9.<\/strong><\/p>\n<p><strong>Le Terminal Ouest disposera de 1.440 m\u00e8tres lin\u00e9aires de quai, fond\u00e9s \u00e0 une profondeur de 18 m\u00e8tres, et sera r\u00e9parti en 2 sections : une premi\u00e8re section de 900 m\u00e8tres d\u00e9di\u00e9e \u00e0 l\u2019activit\u00e9 conteneur et une deuxi\u00e8me de 540 m\u00e8tres pour le traitement des marchandises diverses, fait savoir le communiqu\u00e9.<\/strong><\/p>\n<p><strong>Ce nouveau terminal s\u2019\u00e9tendra sur une superficie de 60 hectares et sera \u00e9quip\u00e9, \u00e0 terme, de 8 portiques de quai (STS), de 24 portiques de parc (RTG) et de 4 grues mobiles de derni\u00e8re g\u00e9n\u00e9ration.<\/strong><\/p>\n<p><strong>Marsa Maroc mobilisera, avec ses partenaires, un investissement estim\u00e9 \u00e0 280 millions d\u2019euros pour la r\u00e9alisation de la premi\u00e8re phase de ce nouveau terminal dont la mise en service est pr\u00e9vue \u00e0 partir de 2027.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Marsa Maroc et la soci\u00e9t\u00e9 Nador West Med ont sign\u00e9 la convention de concession relative au Terminal Ouest de Nador West Med (NWM). Le Conseil d\u2019Administration de Marsa Maroc a autoris\u00e9 la signature des documents de concession du Terminal Ouest du port Nador West Med portant sur une dur\u00e9e de 25 ans, indique un communiqu\u00e9 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":9878,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[26,25,54],"tags":[15541],"yst_prominent_words":[145,69,5135,818,2812],"jetpack_featured_media_url":"https:\/\/le12.ma\/fr\/wp-content\/uploads\/2021\/01\/Marsa-Maroc.jpg","_links":{"self":[{"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/posts\/47700"}],"collection":[{"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/comments?post=47700"}],"version-history":[{"count":1,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/posts\/47700\/revisions"}],"predecessor-version":[{"id":47701,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/posts\/47700\/revisions\/47701"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/media\/9878"}],"wp:attachment":[{"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/media?parent=47700"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/categories?post=47700"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/tags?post=47700"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/le12.ma\/fr\/wp-json\/wp\/v2\/yst_prominent_words?post=47700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}